troniclesno.blogg.se

Avtron load bank k580 manual
Avtron load bank k580 manual








avtron load bank k580 manual

Shut down generator and allow it to cool to "cold start" condition. are turning in the proper direction under emergency power. Run generator long enough to establish proper operation and make sure all pumps, motors etc. Prechecks 1) 2) Fuel, fluid levels, belts, hold-down bolts, etc. Generator Engine and Load Bank Testing Outline A. Load bank testing shall be performed for a period of four (4) hours at the full rated load of the generator, and witnessed by a County representative. Salt water brine tank load banks are not acceptable for this purpose and are disallowed and will not be utilized for this test.

avtron load bank k580 manual

The test instrumentation will serve as a check of the generator set meters. The load bank will be capable of definite and precise incremental loading and shall not be dependent on the generator control instrumentation to read voltage and amperage of each phase. The load test shall use dry type load banks specifically utilized for this purpose. As a minimum, a load bank test performed in accordance with NFPA 110 section 5-13.2 (copy of which is included at the end of this section) as modified by the County shall be conducted. The acceptance tests shall be performed during a field test during which the manufacturers representative shall demonstrate that the system performs in complete compliance with the specifications. Final Operations & Maintenance (O&M) manuals shall be submitted before the acceptance tests commence. Any deficiencies brought to the attention of the contractor shall be corrected and if warranted or requested by the County, the test shall be reperformed prior to acceptance. The contractor shall furnish all testing equipment, materials, fuel, etc., needed to demonstrate the set is in compliance with the specification. The test results shall be submitted to and approved by the County before the generator set is accepted. An authorized representative of Anne Arundel County will also witness the acceptance tests. Acceptance testing of the installed generator set shall be conducted by a factory trained representative of the generator set manufacturer. Tests shall be performed as installed on-site. Provide all equipment, labor, materials and supervision necessary to test the stand-by diesel engine driven electric generator set specified. GENERATOR LOAD BANK TESTING AND ENGINE TESTING I.










Avtron load bank k580 manual